Los Angeles & Southern California
One seamless surface. No demolition, no middleman.
We supply and install microcement over your existing floors, walls, and countertops — the same crew, the same material, start to finish. Most rooms are done in a week.
Why Microcementop
Built for how Southern California homes actually live.
01
We coat what's already there.
Microcement goes directly over existing tile, concrete, or wood — 2 to 3mm thick, up to 1/8 of an inch depending on the system, bonded straight to the surface you already have. No jackhammering, no dumpster in the driveway, no three weeks of dust drifting into every room of the house. If the substrate is sound, we build on it.
02
One crew, start to finish.
We're the supplier and the installer. There's no distributor marking up the material before it reaches a sub, and no sub blaming the distributor when something goes wrong. You call one company, and that company stands behind the floor under your feet.
03
No grout lines. No seams. Nowhere for water to hide.
Applied in continuous coats and sealed as one surface, microcement doesn't have joints for mold or grime to settle into. It runs from floor to wall to shower curb without a break, which is also why it holds up in wet rooms better than most tile installations we've torn out.
04
Most rooms are done in a week.
A bathroom typically runs 3 to 5 days from prep to final seal; a full kitchen or larger living area is closer to a week. Compare that to the 4 to 8 weeks a tear-out tile remodel usually takes once you factor in demo, ordering, and installation delays.
05
One material, inside and out.
The same finish that covers your living room floor can carry straight through the sliding door onto the patio or pool deck, formulated for UV and foot traffic outdoors. In a climate where the line between indoor and outdoor living barely exists, that continuity is the whole point.
What We Cover
Every room, one seamless material.
Microcement isn't limited to one surface. Here's where we install it most across Southern California homes.
Recent Work
A material that reads differently in every room.
How It Works
Four steps, no surprises.
01
Consult
We walk the space, check the existing substrate, and talk through color and finish.
02
Prep
We clean, key, and prime the surface so the microcement bonds properly — no shortcuts here.
03
Apply
Three to five hand-troweled coats — with fiberglass mesh embedded when the system calls for it — build the finish, texture, and color you approved.
04
Seal
A protective sealer locks in water and stain resistance and gives the surface its final sheen.
Questions
What people ask before they call.
Yes, once sealed. The finish itself is porous, similar to concrete, but the sealer we apply over it makes the surface fully waterproof — which is why it works in showers, on pool decks, and around kitchen sinks.
In most cases, no. As long as the existing tile or concrete is structurally sound and not actively cracking or lifting, we prime and coat directly over it. We'll tell you upfront during the consultation if your substrate needs additional prep first.
With the sealer maintained on a normal schedule, a properly installed microcement surface holds up for 10 to 20 years. Floors in high-traffic areas may need a fresh sealer coat every few years to keep the water resistance at full strength.










